Please note, below terms and conditions are applicable for metercube modular kitchen orders only. For other orders’ terms and conditions, Click here.

1. Price Validity: This quotation is an initial estimate until final drawings, technical designs/specifications and price agreement are reached and signed off. This quotation shall be valid for 30 days.

2. The exact price of your project shall depend on actual site measurements, scope of work, material specifications, finishes, designs etc.

3. To proceed with detailed design work based on your requirements, a 10% NON-REFUNDABLE advance amount based on estimated quote should be paid.

4. Once the final scope of work, design, material specifications, finishes etc. have been signed off, a 40% Non-REFUNDABLE payment of the final quote value should be made to proceed for manufacturing/procurement.

5. Any addition/changes after this point will be charged over and above the final quote. There will be no exchange, cancellation or return of material.

6. Our quotation shall not include any civil, plumbing, gas piping & electrical works at your site.

7. Balance 50% (non-refundable) payment shall be made before dispatch of the products to your site which will be intimated as soon as the products are ready for delivery. In case of cancellation of order, the client is liable to pay the balance amount of the final quote value. In the event of a substantial delay in installation by the client, the balance 50% payment should be paid within 30 days from the date of intimation.

8. After sign-off and payment of 50%, if your selected OEM products namely appliances and accessories are unavailable or discontinued, you will have an option to choose alternative products. In case there is any difference in price of the new selection you will have to bear the differential amount.

9. Project handover timeline: 45 days from the date of 50% payment of the final quotation value and sign off.

This does not include:

  • The number of days taken to pay the balance 50% before delivery and installation.
  • The time taken by any other vendor working on the site (electrical, plumbing, stone etc.)
  • Site restriction and accessibility due to work timing or third-party contractors working simultaneously.
  • We prefer to start installation after completion of all civil and interior works namely flooring, painting, POP, false ceiling, carpentry etc.
  • A force majeure event occurs.

10. Warranty:

  • All woodwork for Modular Kitchen shall have up to 10-year warranty from the date of handover against any manufacturing/workmanship defect.
  • All OEM products like hardware, accessories, handles & appliances shall have respective manufacturer’s warranty as specified by them from time to time.
  • All woodwork of wardrobes shall have up to 5-year warranty from the date of handover against any manufacturing/workmanship defect.
  • The warranty is not applicable on countertop and any other stone or tile work.

11. Cleaning services: Post installation, the following set of services will be done on site.

  • Cleaning of our work areas.
  • Cleaning of wooden cabinets to remove pencil marks and dust.
  • Deep cleaning with the use of mechanical equipment is not in our scope.

12. In case of unavailability of service lifts any movement of materials by stairs shall be charged extra.

13. metercube reserves the right to alter/modify any terms and conditions at any point of time without assigning any reason or intimation whatsoever. In case of any dispute, the same shall be subject to the jurisdiction of courts in Bangalore.